BUNGALOW BASE done | Base Building | The Infected Gameplay | S3 EP52
The Infected 9.1 mini update | STONE GRINDER | Patch Notes
The Infected | Rooftop railings and firepots | Solo Gameplay | S2 EP136
Factory FIRST FLOOR Done | Base Building | The Infected Gameplay | S4 EP8
TREEHOUSE GROWS | Base Building | The Infected Gameplay | S3 EP57
Quick Look | WINTER OR SUMMER ONLY SEASONS | The Infected Gameplay
HUGE CHALET MASTER SUITE | Base Building | The Infected Gameplay | S3 EP74
HARDCORE VAMBIES | Base Building | The Infected Gameplay | S3 EP60
SECOND FLOOR | Base Building | The Infected Gameplay | S3 EP96
CHALET WALLS & FLOORS | Base Building | The Infected Gameplay | S3 EP71
BUNGALOW SECOND FLOOR | Base Building | The Infected Gameplay | S3 EP47
8.7 Hotfixes | ROCKS are PLACABLE | The Infected Gameplay | Patch Update
Second Floor | BED & BATHROOM | The Infected Gameplay | S4 EP14
DORMER WINDOWS | Base Building | The Infected Gameplay | S3 EP97
Huge FIREPLACE | Outdoor PICNIC AREA | The Infected Gameplay | S4 EP11
The Infected | Finishing The Cement | Solo Gameplay | S2 EP130
Metal Stove and Food Prep Table | The Infected Gameplay | S3 EP21
The Infected 9.6.2 Hotfix | TURN OFF SUN RESISTANCE | Patch Notes
CHALET ROOF RAISED | Base Building | The Infected Gameplay | S3 EP73
ALL GLASS HOUSE | Base Building | The Infected Gameplay | S3 EP103